What is the difference between the National Energy Certification and Energy Certification Casaclima? Raising a
Energy certification Casaclima is more serious than that, for a simple reason: if, at the mere calculation of energy consumption information, that any engineer knows how to make media experience with the various softwares that are on the market, does not follow a careful evaluation the work during the actual place of work, we're not working for efficiency. For example, the national legislation does not take into account the presence of thermal bridges, or of those critical points are found, for example in reinforced concrete structures, and causing great losses if they are not properly shielded.
basic steps to perform, in the design and implementation of a low-consumption possono così sintetizzare:
A. FASE PROGETTUALE:
1. Analisi del territorio: posizionamento gps del futuro edificio, analisi con software (tipo Meteonorm) dei dati climatici stagionali del terreno (e non solo della zona climatica) su cui si vuole costruire, analisi dell’ombreggiatura del terreno, insolazione media annuale e mensile, temperatura media del terreno;
2. Analisi dell’esistente (solo nel caso di ristrutturazioni) con termografie, carotaggi (se necessari) ecc.;
3. Analisi degli obiettivi del committente (ecologici ed economici): Quale classe energetica si vuole raggiungere? Qual è il costo aggiuntivo per raggiungere questa classe? Quale savings you get? What funding can be accessed?
4. Draft architectural renderings with 3D: Creating a shell that is aesthetically pleasing, but also suitable for energy class to reach (see Section 3);
5. Analysis of the expected use in the preventative software for the calculation of annual heat demand measured in € / sqm. year
6. Correction and coordination between different projects (HVAC, engineers ...) to achieve the objectives (see paragraph 3):
7. Composition specifications, with drawings to be attached thereto: it is necessary to describe the detailed product specifications, so you do not have surprises with the construction companies (charging, lack of experience etc.).
B. Execution phase:
1. Works management.
2. Monitoring the activities of manufacturers.
3. Susceptibility tests in progress and finished work (blower door test, thermography, etc..): Used to measure the actual tightness of the building, and for the detection of any residual thermal bridges - Reserved for higher efficiency classes (Class A \u0026lt;20 kWh / sqm Year, Passive \u0026lt;10 kWh / sqm Year)
4. Final certification of the building (Plate Casaclima) by the Agency Casaclima.
the Casaclima certification is designed to avoid the conflict of interests is carried out directly by the Agency, and then the designer or the supervisor can intervene in the process.