photosynthesis (artificiale. ..) will save us!
Hello everyone!
I write this post to update you on something that has the sensational: the synthetic chlorophyll could be the panacea for the ills of human energy!
course is still a bit 'too early to cry for revolution, however, the Massey University in New Zealand, has discovered, thanks to nanotechnology ( ... and you see that even the scientist who discovered it was an Italian, here shoe-shining some baron? We can not know ...), a synthetic green pigment, stressed from the sun has produced energy! And at a cost of production would be equal to one tenth that of current silicon cells. We hope that before
AgipEniMorattiecompagniabellaingiroperilmondo put your hands up and hide in a drawer for conitnuare to use oils and spent casings in their power, but brilliant pioneering this technology can be developed in a way. In addition, we use as base material titanium dioxide, renewable and non-toxic material. More news to be found here:
1 - www.venetonanotech.it/files/index.cfm?id_rst=31&id_elm=1513
2 - http://nrc.massey.ac.nz/projects.shtml (Official site of Massey University in English - search for the "surface chemistry").
Mail, posted!
Thursday, April 12, 2007
Monday, April 2, 2007
New Asics Glow In The Dark Shoes
THE PASSIVE HOUSE, ITALIAN CHIMERA.
E 'for some time that, alongside the traditional design, I started creating a small network with a group of related companies (suppliers, fitters and electricians).
We deal in green building design and construction of all types, and project / coordination of work (edited by me), suppliers of materials, to the layers, the test runs, everything is controlled and operated from within, in order to decrease and the time of creation, the disadvantages and construction costs. We are also trying to obtain certification in Germany (PassivHaus) for our buildings, as these are much more forward with respect to the latter provisions of law (those of financial 2007): namely, energy efficiency parameters were also 5-6 times more stringent .
In my humble opinion, the fact that, in many cases, during the design phase the architect to go away "for its aesthetic facts," without due collaboration with formitori materials, facilities and businesses that contribute to a project, leads to serious deficiencies in the subsequent implementation, leading to dissipate work, time, effort and money (the customer, among other things, which should be the first person to be interested in this). milgiori projects, in fact, are always those where a long design phase followed by a rapid implementation phase, because each figure in the creation cionvolta already clear what to do (except for all the obvious contingencies, which in the case of the construction of a building are still around the corner).
Not to mention the fact that I think the customer should be instructed on what the architect wants to "combine" in his house, not only in terms of aesthetics, but especially at the technical level.
The passive house, which in some European countries (see Germany), has become a happy reality, that saves more than 90% of spese (si, proprio 90%!!!!) di riscaldamento, raffrescamento, energia elettrica e produzione di acqua calda e fredda , da noi รจ ancora "paZZiva ", con consumi imbarazzanti, e questo anche sulle nuove costruzioni!!!.
E 'for some time that, alongside the traditional design, I started creating a small network with a group of related companies (suppliers, fitters and electricians).
We deal in green building design and construction of all types, and project / coordination of work (edited by me), suppliers of materials, to the layers, the test runs, everything is controlled and operated from within, in order to decrease and the time of creation, the disadvantages and construction costs. We are also trying to obtain certification in Germany (PassivHaus) for our buildings, as these are much more forward with respect to the latter provisions of law (those of financial 2007): namely, energy efficiency parameters were also 5-6 times more stringent .
In my humble opinion, the fact that, in many cases, during the design phase the architect to go away "for its aesthetic facts," without due collaboration with formitori materials, facilities and businesses that contribute to a project, leads to serious deficiencies in the subsequent implementation, leading to dissipate work, time, effort and money (the customer, among other things, which should be the first person to be interested in this). milgiori projects, in fact, are always those where a long design phase followed by a rapid implementation phase, because each figure in the creation cionvolta already clear what to do (except for all the obvious contingencies, which in the case of the construction of a building are still around the corner).
Not to mention the fact that I think the customer should be instructed on what the architect wants to "combine" in his house, not only in terms of aesthetics, but especially at the technical level.
The passive house, which in some European countries (see Germany), has become a happy reality, that saves more than 90% of spese (si, proprio 90%!!!!) di riscaldamento, raffrescamento, energia elettrica e produzione di acqua calda e fredda , da noi รจ ancora "paZZiva ", con consumi imbarazzanti, e questo anche sulle nuove costruzioni!!!.
Subscribe to:
Posts (Atom)